Good Neighbor

Data centers that are good neighbors.

Grow your community. Protect your neighbors.

Many communities want the jobs and tax money a data center brings. They also fear higher power bills, lost water, and noise. The Good Neighbor Approach™ sets clear limits before a project is built. Then you can check them after it opens.

7 promises in writing

Every promise has a number, and an outside expert checks it. All before anything is built.

Seven promises at a glance

Select any promise to see the exact standard and how your community can check it.

How each promise works

What we commit to, the standard behind it, and how you can check it.

Low water

The standard

Cooling uses a closed loop, with no cooling towers. Water is used only to make power and to restart equipment.

The limit works like a food label. It shows sugar per serving, not per box. Here, one serving is the power one home uses in a month.

That is about 90% less, or one-tenth as much. A bigger site makes more servings. Each must stay below the limit.

Water Facts
Serving size: the power one home uses in a month
This site48 gal or less
Average data centerabout 450 gal
About 90% less water per serving
How you can check

Water study before building. Meter readings posted each year. Fixes are required if limits are missed.

Low emissions

The standard

Main power is made on site. It must be as clean as California requires of its best big power plants.

The same food label idea applies. For each serving of power, the site may let out no more than the amounts shown.

Air Facts
Serving size: the power one home uses in a month. Most allowed per serving:
Smog gasNitrogen oxides1 oz
Carbon monoxide1½ oz
Other smog gasesVolatile organic compounds⅓ oz
California best-plant standard
How you can check

An outside expert tests the air before it opens and each year.

Low noise

The standard
55 dBDaytime limit
45 dBNight, 10 PM to 7 AM

Measured at the nearest home’s property line. At night, that is about as loud as a quiet room. There is also a limit to low hum. Backup power is tested on weekdays, in the day only.

How you can check

Sound study before building. Outside sound test within 60 days of opening. Fixes are required if limits are missed.

Low grid impact

The standard

The site makes its own power. It draws little or no power from the local grid each day.

How you can check

The utility puts this in writing before building starts.

Ratepayer protection

The standard

The project pays 100% of the power lines, substations, or gas lines it needs. If it ever buys power from the utility, it signs a long contract. The contract has a monthly minimum, a deposit, and fees to leave early.

Families and local stores do not pay the bill.

How you can check

Contract terms are filed with the utility and shared with local leaders.

Responsible land use

The standard
200 ftBuildings from property lines
400 ftNoisy gear from homes

Trees and plants screen the site. Money is set aside to take out the equipment if the site closes.

How you can check

Site plan and removal bond approved before permits.

Community benefits

The standard

A written agreement with the community, signed before building starts. It sets goals for local hiring, job training, and a yearly fund.

How you can check

A public report on hiring and giving, each year.

For residents

Your power bill, your water, and your quiet nights are protected in writing. Every promise has a number. An outside expert checks each one.

For public officials

Each standard can become a permit rule. The Federal Energy Regulatory Commission is still making national rules on who pays for grid work. Local rules protect your community now.

Ask for a Good Neighbor Review before your next vote.

We will walk your council, commission, or community group through each promise for a proposed site.

Request a Good Neighbor Review

Sources: California Air Resources Board Distributed Generation Certification (nitrogen oxides 0.07, carbon monoxide 0.10, volatile organic compounds 0.02 pounds per megawatt-hour of power made; one serving is about one megawatt-hour; site total equals limit times power made). The Green Grid (0.2 versus about 1.9 liters per kilowatt-hour of computer power; 1 gallon = 3.785 liters). U.S. Energy Information Administration (average home uses 899 kilowatt-hours a month). Noise: Jones County, Georgia; Phoenix, Arizona. Utility contracts: AEP Ohio, Dominion Energy. Federal Energy Regulatory Commission orders, June 18, 2026. Figures rounded.

Good Neighbor standards are proposed and confirmed site by site. Timelines, capacity, performance, and cost outcomes are targets, subject to permitting, interconnection, supply chain, market, and regulatory factors.